Enamel top coats now going on. Takes ages to dry in this climate though. The green looks better in reality than in the pics.
Monday, 27 October 2008
Wednesday, 22 October 2008
Chassis Painting
Collection Day
The garage just waiting to be occupied.
Saturday 18th October 2008
At last the big day arrived. Rented a large luton van and set off for a short thrash down the A1 to the GBS factory. Well I say thrash more like 50-60mph maximum (not kidding, 55 plate van as well).
Arrived at the factory with plenty of time to spare. Kit stacked up ready and waiting for loading.
Richard of GBS helped load the van up and tick the parts off
All loaded up ready to go :-)
Saturday 18th October 2008
At last the big day arrived. Rented a large luton van and set off for a short thrash down the A1 to the GBS factory. Well I say thrash more like 50-60mph maximum (not kidding, 55 plate van as well).
Arrived at the factory with plenty of time to spare. Kit stacked up ready and waiting for loading.
Richard of GBS helped load the van up and tick the parts off
All loaded up ready to go :-)
Subscribe to:
Posts (Atom)