Now all primed and waiting for the brooklands green top coat
Wednesday, 22 October 2008
Chassis Painting
Was going to brush paint the chassis, but I am lucky enough to have a fully equiped workshop. So decided to take it outside into the yard and spray it using my spray gun. Was lots quicker and gives a much better finish.
Now all primed and waiting for the brooklands green top coat



Now all primed and waiting for the brooklands green top coat
Collection Day
The garage just waiting to be occupied.


Saturday 18th October 2008
At last the big day arrived. Rented a large luton van and set off for a short thrash down the A1 to the GBS factory. Well I say thrash more like 50-60mph maximum (not kidding, 55 plate van as well).
Arrived at the factory with plenty of time to spare. Kit stacked up ready and waiting for loading.

Richard of GBS helped load the van up and tick the parts off

All loaded up ready to go :-)
Saturday 18th October 2008
At last the big day arrived. Rented a large luton van and set off for a short thrash down the A1 to the GBS factory. Well I say thrash more like 50-60mph maximum (not kidding, 55 plate van as well).
Arrived at the factory with plenty of time to spare. Kit stacked up ready and waiting for loading.
Richard of GBS helped load the van up and tick the parts off
All loaded up ready to go :-)
Subscribe to:
Posts (Atom)
